Located on the Firth of Clyde, Hunterston PARC features some of the UK’s deepest waters, with a maximum draught of 35 metres - ideal for large-scale energy projects and heavy marine logistics.
The site offers extensive capabilities including alongside vessel access, anchorage for floating foundations, current and future cranage, extensive load-bearing laydown and assembly areas, pontoon space and potential for modular construction.
With a redevelopment pipeline underway, Hunterston PARC is poised to become a world-class centre for
• Turbine assembly
• Project staging and pre-assembly
• Operations and maintenance